The production process of foaming machine

1. Feeding and mixing: Add a certain amount of cement, foaming agent and foam stabilizing enhancer to the mixer through the feeding system, and dry mix for 30 seconds;

2. Stirring: Add a certain amount of warm water to the mixer, and stir for 2 minutes; add a certain amount of foaming agent to the mixer and stir for 8-15 seconds;

3. Injection molding and foaming: then inject the slurry into the mold for foaming, and the foaming process takes about 3-5 minutes;

4. Initial maintenance: After the injection molding is completed, let it stand for several hours for initial maintenance;

5. Demoulding: The foamed cement insulation board can be demolded when it has initial strength and complete initial setting;

6. Cutting: The foamed cement insulation board blank with certain strength can be cut after demoulding, and the cutting specification can be adjusted according to the needs of the cutting blade;

7. Finished product maintenance: The maintenance age of foamed cement insulation board should not be less than 7 days.